Skip to main content
TOMPW Service logo
TOMPW

Global semiconductor delivery

← Back to SMIC profile
SMIC foundry logo

MPW / Shuttle access

SMIC 65nm MPW

Plan a 65nm multi-project wafer run at SMIC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.

Node: 65nmMPW, NTO and production evaluation

Why 65nm

65nm is a widely available, low-cost node with mature PDKs and ample IP. TOMPW coordinates 65nm MPW shuttles for prototype and volume production alike.

Typical applications

  • MCU and IoT chips
  • Mixed-signal and RF
  • PMIC and consumer ICs
  • Industrial applications

What a 65nm MPW at SMIC involves

A 65nm MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches SMIC's line on schedule.

MPW shuttle for SMIC nodes
NTO and production mask support
Mature node cost optimization
China-based manufacturing coordination

Technologies & platforms at 65nm

CMOS
BCD
eFlash
RF CMOS
HV CMOS
MEMS

Notes for 65nm programs

  • SMIC offers strong cost performance for mature and mainstream nodes.
  • TOMPW supports global customers accessing SMIC through a coordinated execution path.

Best-fit applications

Consumer and IoT chipsIndustrial and automotive applicationsCost-sensitive production programsTeams wanting China-based foundry access

Expert reviewed

This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.

Discuss a 65nm MPW at SMIC

TOMPW Service can coordinate a 65nm MPW shuttle with SMIC as part of a scoped execution path.

Email for a Quote

COMMON QUESTIONS

Working with SMIC 65nm MPW through TOMPW

Can TOMPW arrange a 65nm MPW shuttle at SMIC?

Yes. TOMPW coordinates 65nm MPW and shuttle access at SMIC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.

What does a 65nm MPW run at SMIC typically include?

A 65nm MPW run bundles your design onto a shared reticle with other projects, covering mask share, wafer fabrication at SMIC, and standard probe. Packaging, final test and NTO transition are planned separately with TOMPW.

How long does a 65nm MPW cycle take at SMIC?

Cycle time depends on SMIC's shuttle cadence for 65nm, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.

What comes after a 65nm MPW at SMIC?

After a successful 65nm MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through SMIC and downstream partners.

RELATED FOUNDRY PROFILES

Other foundries teams compare SMIC with

RELATED SERVICES

Services that pair with a SMIC 65nm MPW