Verification That Reduces Expensive Silicon Surprises

Verification quality directly affects tape-out confidence. TOMPW helps connect design intent, verification strategy and the manufacturing consequences of missing bugs.

ASIC teams approaching tape-out freezePrograms mixing internal design with external implementation helpProducts with expensive respin risk
Process technology chart used as supporting semiconductor image
Die probe on a TOMPW-coordinated LNA tape-out
Switch die probed during a TOMPW tape-out
Wafer from a TOMPW-coordinated MPW run
EDA close-up from a TOMPW-tracked design review

Included Scope

What this service is built to handle

  • Functional verification planning
  • Coverage and corner-case review
  • Validation preparation for silicon bring-up
  • Coordination with DFT, test and post-silicon teams

Best Fit

Common situations where this path makes sense

  • ASIC teams approaching tape-out freeze
  • Programs mixing internal design with external implementation help
  • Products with expensive respin risk

Deliverables

Typical outputs from TOMPW coordination

  • Verification scope review
  • Coverage and risk checklist
  • Validation handoff notes
  • Post-silicon readiness alignment

ENGAGEMENT MODEL

How Design Verification runs stage by stage

Verification effort is finite, so the useful question is not whether a design is fully verified. It is whether the right corners got the effort that was available.

Stage 1

Coverage planning

What we need from you

  • • Design intent and failure modes that matter most
  • • Existing verification assets, if any
  • • Known weak areas from previous revisions

What TOMPW handles

  • • Feature list mapped to coverage goals
  • • Prioritised corner list
  • • Agreement on where effort stops

Exit gate: Coverage plan accepted by both sides.

Stage 2

Execution and closure

What we need from you

  • • Environment and regression capacity
  • • Bug triage owner
  • • Definition of done for each check

What TOMPW handles

  • • Regression structure and reporting cadence
  • • Bug triage pack with severity mapping
  • • Coverage closure evidence

Exit gate: Remaining bugs are documented as accepted risks.

Stage 3

Silicon readiness

What we need from you

  • • Bring-up plan for first silicon
  • • Debug instrumentation expectations
  • • Test access considerations

What TOMPW handles

  • • Bring-up checklist tied to verification gaps
  • • Debug plan for the likely failure modes
  • • Handoff notes for the test team

Exit gate: Tape-out approved with known risks on record.

Verification planning is most valuable before implementation finishes. Teams arriving late usually buy less coverage for the same money.

Limits worth agreeing before you commit

  • • Verification cannot prove absence of bugs; it bounds the risk that was affordable.
  • • Results are tied to the testbench and models used, and should be re-run after specification changes.
  • • Silicon behaviour can still differ from simulation, particularly for analog and mixed-signal paths.

Execution Notes

Commercially important details buyers usually ask later

  • Verification scope should track product risk, not only block-level completion.
  • Bring-up and test assumptions need to be part of the verification conversation early.
  • This page avoids over-claiming exact methodologies when the final customer flow varies.

Next Move

Share node, schedule and downstream requirements together

The right recommendation depends on more than one keyword. For example, package, CP, FT and sample goals often change whether MPW, NTO or a broader turnkey path makes the most sense.

Email project context

FAQ

Questions buyers ask around Design Verification

At minimum: the verification plan with coverage targets, regression results on the final netlist, CDC/RDC and low-power checks where they apply, and static timing sign-off against the foundry rules for your operating corners. TOMPW works through this list with you before submission and flags which items are still open rather than assuming they are done.

Yes. Escaped bugs can force respins, schedule slip and repeated packaging or test spend. Stronger verification planning usually lowers total program risk and avoids the most expensive failure mode: discovering a bug after wafers return.

Related Services

Adjacent steps in the same silicon program

FOUNDRY COVERAGE

Foundry profiles to compare for this path

Compare public technology profiles for Design Verification, from advanced logic to mature analog, compound and specialty processes. PDK access, contracting route and current availability are confirmed for each project.

PLANNING TOOLS

Calculators that support Design Verification

Estimate dies per wafer, split shared-mask cost and model unit economics for this path.