
MPW / Shuttle access
SMIC 40nm MPW
Plan a 40nm multi-project wafer run at SMIC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.
Why 40nm
40nm is a cost-effective node with a large IP and PDK ecosystem, ideal for mainstream mixed-signal designs. TOMPW coordinates 40nm MPW runs for prototype and low-volume production.
Typical applications
- ✓Connectivity and RF ICs
- ✓PMIC and analog
- ✓Consumer and IoT chips
- ✓Industrial sensors
What a 40nm MPW at SMIC involves
A 40nm MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches SMIC's line on schedule.
Technologies & platforms at 40nm
Notes for 40nm programs
- SMIC offers strong cost performance for mature and mainstream nodes.
- TOMPW supports global customers accessing SMIC through a coordinated execution path.
Best-fit applications
Expert reviewed
This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.
Discuss a 40nm MPW at SMIC
TOMPW Service can coordinate a 40nm MPW shuttle with SMIC as part of a scoped execution path.
Email for a QuoteCOMMON QUESTIONS
Working with SMIC 40nm MPW through TOMPW
Can TOMPW arrange a 40nm MPW shuttle at SMIC?
Yes. TOMPW coordinates 40nm MPW and shuttle access at SMIC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.
What does a 40nm MPW run at SMIC typically include?
A 40nm MPW run bundles your design onto a shared reticle with other projects, covering mask share, wafer fabrication at SMIC, and standard probe. Packaging, final test and NTO transition are planned separately with TOMPW.
How long does a 40nm MPW cycle take at SMIC?
Cycle time depends on SMIC's shuttle cadence for 40nm, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.
What comes after a 40nm MPW at SMIC?
After a successful 40nm MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through SMIC and downstream partners.
RELATED FOUNDRY PROFILES
Other foundries teams compare SMIC with
RELATED SERVICES
Services that pair with a SMIC 40nm MPW
MPW / Fab Shuttle
Compare public shuttle windows across foundries, control first-silicon cost and move from tape-out planning to wafer delivery with one execution path.
Learn more →Full Mask / Production Foundry
Move validated designs into dedicated mask production with yield, volume and supply planning support.
Learn more →Semiconductor Packaging
Plan package type, prototype assembly, inspection and qualification early so silicon delivery does not stall after wafer completion.
Learn more →Test & Product Engineering
Connect CP, FT and reliability planning so packaged silicon is measurable, debuggable and ready for customer evaluation.
Learn more →Turnkey ASIC Solutions
Unify design support, tape-out, packaging, test, board work and delivery under one execution-facing partner.
Learn more →