Skip to main content
TOMPW Service logo
TOMPW
← Back to SMIC profile
SMIC foundry logo

MPW / Shuttle access

SMIC 0.11μm MPW

Plan a 0.11μm multi-project wafer run at SMIC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.

Node: 0.11μmMPW, NTO and production evaluation

Why 0.11μm

0.11μm is one of the process options TOMPW coordinates as a shared-mask MPW run at the partner foundry. We handle slot selection, EDA checks and logistics so your design reaches the line on schedule.

What a 0.11μm MPW at SMIC involves

A 0.11μm MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches SMIC's line on schedule.

  1. Step 1: GDSII & spec

    Step 1

    GDSII & spec

    Share your GDSII, target node and tape-out window.

  2. Step 2: Slot & mask share

    Step 2

    Slot & mask share

    TOMPW books the next shuttle and aligns mask share.

  3. Step 3: Wafer, package, test

    Step 3

    Wafer, package, test

    Wafers returned, then package/test aligned as needed.

✓MPW shuttle for SMIC nodes
✓NTO and production mask support
✓Mature node cost optimization
✓China-based manufacturing coordination

Platforms across SMIC

Foundry-level platforms, not a list of everything 0.11μm offers. Which of these apply to your 0.11μm run is confirmed per project.

CMOS
BCD
eFlash
RF CMOS
HV CMOS
MEMS

Notes on working with SMIC

  • SMIC offers strong cost performance for mature and mainstream nodes.
  • TOMPW supports global customers accessing SMIC through a coordinated execution path.

Best-fit applications

Consumer and IoT chipsIndustrial and automotive applicationsCost-sensitive production programsTeams wanting China-based foundry access

Expert reviewed

This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.

Discuss a 0.11μm MPW at SMIC

TOMPW Service can coordinate a 0.11μm MPW shuttle with SMIC as part of a scoped execution path.

Email for a Quote

COMMON QUESTIONS

Working with SMIC 0.11μm MPW through TOMPW

Can TOMPW arrange a 0.11μm MPW shuttle at SMIC?

Yes. TOMPW coordinates 0.11μm MPW and shuttle access at SMIC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.

What does a 0.11μm MPW run at SMIC typically include?

A 0.11μm MPW run bundles your design onto a shared reticle with other projects, covering mask share and wafer fabrication at SMIC. Wafer-level probe is included only on the shuttles that offer it, so we confirm probe coverage for the specific run before you commit. Packaging, final test and the NTO transition are scoped separately with TOMPW.

How long does a 0.11μm MPW cycle take at SMIC?

Cycle time depends on SMIC's shuttle cadence for 0.11μm, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.

What comes after a 0.11μm MPW at SMIC?

After a successful 0.11μm MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through SMIC and downstream partners.

PLAN & ESTIMATE

Calculators for your 0.11μm MPW

Estimate dies per wafer, split shared-mask cost and model unit economics before you commit to a shuttle slot.

RELATED FOUNDRY PROFILES

Other foundries teams compare SMIC with

RELATED SERVICES

Services that pair with a SMIC 0.11μm MPW

RELATED MPW NODES

Other 0.11μm and SMIC MPW access pages

Browse adjacent shuttle nodes so comparison and scheduling research stays on one program path.

CROSS-FOUNDRY COMPARISON

Compare 0.11μm across foundries

Compare 9 listed foundry profiles for 0.11μm, including SMIC. Use the node comparison tool to review process and MPW planning context; public-reference profiles require separate confirmation of project access and current run options.