Skip to main content
TOMPW Service logo
TOMPW

Free planning tool

Node / Wafer DPW Comparison

Lock your die size and compare how many dies fit — and what each die costs — across wafer sizes. A quick way to reason about 200 mm vs 300 mm and find the sweet spot for your volume and budget.

Yield model
Wafer sizes to compare
200 mm (8")268 dies
300 mm (12")633 dies
WaferDPWUtil.Wafer $$/die
200 mm (8")26885.3%$13.060
300 mm (12")63389.6%$18.957

Larger wafers fit far more dies, but cost more — the $/die column shows the trade-off for your specific die. Edit wafer cost per size to model your quoted prices.

Export

Disclaimer: This tool and its outputs are for reference and preliminary evaluation only, not design, manufacturing, qualification or commercial approval; verify all results with the responsible supplier or engineer.

WHY WAFER SIZE MATTERS

The 8-inch vs 12-inch effect

For the same die, moving to a larger wafer roughly doubles usable area. The calculator below turns that into exact DPW and $/die for your dimensions.

Swipe horizontally to read the full chart.

8-inch vs 12-inch: dies per waferIllustrative, fixed 8 × 8 mm die (gross, edge exclusion applied)200 mm8-inch≈ 430 dies300 mm12-inch≈ 960 diesDies per wafer (same die)430960
Larger wafers roughly double usable area, so $/die can drop 30–40% at volume — but wafer cost rises too. Compare on the calculator for your exact die.

What to watch

  • Moving from 200 mm to 300 mm roughly doubles usable area, but wafer cost rises too — compare $/die, not just DPW.
  • Small dies gain the most from larger wafers; very large dies are edge-limited either way.
  • For MPW/shuttle, the right wafer size is also driven by which shuttles your target foundry actually runs.

See which foundries run which shuttles on the MPW schedule page.

These are industry reference ranges, not a quotation and not an offer.

  • Every band on this page is deliberately wide. It is published so you can sanity-check whether a programme is realistic before you write to anyone — not so you can budget against it.
  • Actual pricing moves with the season and with capacity. Foundry and OSAT utilisation changes month to month, and a window that is cheap in a soft quarter can be materially more expensive in a tight one.
  • Mask, substrate, leadframe, gold, copper and tester-time costs all move independently of the node you chose.