Skip to main content
TOMPW Service logo
TOMPW
← Back to TSMC profile
TSMC foundry logo

MPW / Shuttle access

TSMC 22ULL MPW

Plan a 22ULL multi-project wafer run at TSMC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.

Node: 22ULLMPW, NTO and production evaluation

Why 22ULL

22ULL is one of the process options TOMPW coordinates as a shared-mask MPW run at the partner foundry. We handle slot selection, EDA checks and logistics so your design reaches the line on schedule.

What a 22ULL MPW at TSMC involves

A 22ULL MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches TSMC's line on schedule.

  1. Step 1: GDSII & spec

    Step 1

    GDSII & spec

    Share your GDSII, target node and tape-out window.

  2. Step 2: Slot & mask share

    Step 2

    Slot & mask share

    TOMPW books the next shuttle and aligns mask share.

  3. Step 3: Wafer, package, test

    Step 3

    Wafer, package, test

    Wafers returned, then package/test aligned as needed.

MPW shuttle windows
NTO / engineering run support
Full mask production
Advanced node tape-out coordination
Package and test alignment

Technologies & platforms at 22ULL

CMOS
BCD
RF CMOS
SOI
SiGe BiCMOS

Notes for 22ULL programs

  • Advanced node programs are evaluated case by case based on schedule and commercial model.
  • TOMPW helps coordinate MPW to production transition on TSMC nodes.
  • TSMC 22nm (22ULP / 22ULL) MPW block is typically ~6 mm²; >10 mm² die may require a multi-block quote — confirm by project.

Best-fit applications

AI and HPC programsMobile and consumer SoCAdvanced node first-silicon validationTeams needing mature advanced-node support

Expert reviewed

This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.

Discuss a 22ULL MPW at TSMC

TOMPW Service can coordinate a 22ULL MPW shuttle with TSMC as part of a scoped execution path.

Email for a Quote

COMMON QUESTIONS

Working with TSMC 22ULL MPW through TOMPW

Can TOMPW arrange a 22ULL MPW shuttle at TSMC?

Yes. TOMPW coordinates 22ULL MPW and shuttle access at TSMC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.

What does a 22ULL MPW run at TSMC typically include?

A 22ULL MPW run bundles your design onto a shared reticle with other projects, covering mask share, wafer fabrication at TSMC, and standard probe. Packaging, final test and NTO transition are planned separately with TOMPW.

How long does a 22ULL MPW cycle take at TSMC?

Cycle time depends on TSMC's shuttle cadence for 22ULL, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.

What comes after a 22ULL MPW at TSMC?

After a successful 22ULL MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through TSMC and downstream partners.

PLAN & ESTIMATE

Calculators for your 22ULL MPW

Estimate dies per wafer, split shared-mask cost and model unit economics before you commit to a shuttle slot.

RELATED FOUNDRY PROFILES

Other foundries teams compare TSMC with

RELATED SERVICES

Services that pair with a TSMC 22ULL MPW

RELATED MPW NODES

Other 22ULL and TSMC MPW access pages

Browse adjacent shuttle nodes so comparison and scheduling research stays on one program path.