Skip to main content
TOMPW Service logo
TOMPW
← Back to CSMC profile
CSMC foundry logo

MPW / Shuttle access

CSMC 0.35µm MPW

Plan a 0.35µm multi-project wafer run at CSMC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.

Node: 0.35µmMPW, NTO and production evaluation

Why 0.35µm

0.35µm is one of the process options TOMPW coordinates as a shared-mask MPW run at the partner foundry. We handle slot selection, EDA checks and logistics so your design reaches the line on schedule.

What a 0.35µm MPW at CSMC involves

A 0.35µm MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches CSMC's line on schedule.

  1. Step 1: GDSII & spec

    Step 1

    GDSII & spec

    Share your GDSII, target node and tape-out window.

  2. Step 2: Slot & mask share

    Step 2

    Slot & mask share

    TOMPW books the next shuttle and aligns mask share.

  3. Step 3: Wafer, package, test

    Step 3

    Wafer, package, test

    Wafers returned, then package/test aligned as needed.

Mature-node MPW coordination
BCD and power platform support
HV analog process access
Cost-optimized production

Technologies & platforms at 0.35µm

BCD
CMOS
HV CMOS
Analog / Mixed-Signal

Notes for 0.35µm programs

  • CSMC provides broad mature-node coverage for power and analog designs.
  • TOMPW can coordinate CSMC programs for Asia-based supply chains.

Best-fit applications

Power management and BCD applicationsIndustrial and automotive analogSmartcard and security ICsCost-sensitive production

Expert reviewed

This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.

Discuss a 0.35µm MPW at CSMC

TOMPW Service can coordinate a 0.35µm MPW shuttle with CSMC as part of a scoped execution path.

Email for a Quote

COMMON QUESTIONS

Working with CSMC 0.35µm MPW through TOMPW

Can TOMPW arrange a 0.35µm MPW shuttle at CSMC?

Yes. TOMPW coordinates 0.35µm MPW and shuttle access at CSMC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.

What does a 0.35µm MPW run at CSMC typically include?

A 0.35µm MPW run bundles your design onto a shared reticle with other projects, covering mask share, wafer fabrication at CSMC, and standard probe. Packaging, final test and NTO transition are planned separately with TOMPW.

How long does a 0.35µm MPW cycle take at CSMC?

Cycle time depends on CSMC's shuttle cadence for 0.35µm, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.

What comes after a 0.35µm MPW at CSMC?

After a successful 0.35µm MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through CSMC and downstream partners.

PLAN & ESTIMATE

Calculators for your 0.35µm MPW

Estimate dies per wafer, split shared-mask cost and model unit economics before you commit to a shuttle slot.

RELATED FOUNDRY PROFILES

Other foundries teams compare CSMC with

RELATED SERVICES

Services that pair with a CSMC 0.35µm MPW

RELATED MPW NODES

Other 0.35µm and CSMC MPW access pages

Browse adjacent shuttle nodes so comparison and scheduling research stays on one program path.

CROSS-FOUNDRY COMPARISON

Compare 0.35µm across foundries

0.35µm MPW is offered by 9 TOMPW-supported foundries including CSMC. Use the node comparison tool to see per-foundry shuttle cadence, MPW cost-sharing and ecosystem notes side by side.