
MPW / Shuttle access
CSMC 0.13µm MPW
Plan a 0.13µm multi-project wafer run at CSMC through TOMPW Service. We coordinate shared-mask access, EDA sign-off, shuttle scheduling and the downstream packaging or test path for global chip teams.
Why 0.13µm
0.13µm is one of the process options TOMPW coordinates as a shared-mask MPW run at the partner foundry. We handle slot selection, EDA checks and logistics so your design reaches the line on schedule.
What a 0.13µm MPW at CSMC involves
A 0.13µm MPW (multi-project wafer) shuttle places several customer designs on one shared mask set, so each team pays only for its portion of the wafer. TOMPW Service handles slot selection, DRC/LVS review and logistics so your GDSII reaches CSMC's line on schedule.
Technologies & platforms at 0.13µm
Notes for 0.13µm programs
- CSMC provides broad mature-node coverage for power and analog designs.
- TOMPW can coordinate CSMC programs for Asia-based supply chains.
Best-fit applications
Expert reviewed
This page is reviewed by Henry, CEO, TOMPW Service. Henry is the CEO of TOMPW Service and a chip-design specialist with 20 years in the semiconductor industry.
Discuss a 0.13µm MPW at CSMC
TOMPW Service can coordinate a 0.13µm MPW shuttle with CSMC as part of a scoped execution path.
Email for a QuoteCOMMON QUESTIONS
Working with CSMC 0.13µm MPW through TOMPW
Can TOMPW arrange a 0.13µm MPW shuttle at CSMC?
Yes. TOMPW coordinates 0.13µm MPW and shuttle access at CSMC for overseas teams, handling slot selection, EDA checks and logistics so your design reaches the shared mask on schedule.
What does a 0.13µm MPW run at CSMC typically include?
A 0.13µm MPW run bundles your design onto a shared reticle with other projects, covering mask share, wafer fabrication at CSMC, and standard probe. Packaging, final test and NTO transition are planned separately with TOMPW.
How long does a 0.13µm MPW cycle take at CSMC?
Cycle time depends on CSMC's shuttle cadence for 0.13µm, usually a few months from mask data to returned wafers. Missing a window means waiting for the next one, so TOMPW recommends booking early.
What comes after a 0.13µm MPW at CSMC?
After a successful 0.13µm MPW, teams typically move to NTO or full-mask production. TOMPW helps plan that transition, including package selection, test development and volume ramp through CSMC and downstream partners.
RELATED FOUNDRY PROFILES
Other foundries teams compare CSMC with
RELATED SERVICES
Services that pair with a CSMC 0.13µm MPW
MPW / Fab Shuttle
Compare public shuttle windows across foundries, control first-silicon cost and move from tape-out planning to wafer delivery with one execution path.
Learn more →Full Mask / Production Foundry
Move validated designs into dedicated mask production with yield, volume and supply planning support.
Learn more →Semiconductor Packaging
Plan package type, prototype assembly, inspection and qualification early so silicon delivery does not stall after wafer completion.
Learn more →Test & Product Engineering
Connect CP, FT and reliability planning so packaged silicon is measurable, debuggable and ready for customer evaluation.
Learn more →Turnkey ASIC Solutions
Unify design support, tape-out, packaging, test, board work and delivery under one execution-facing partner.
Learn more →